Skip to content

00. Design basis (shared assumptions)

Several of these assumptions were overturned

This page is kept as the original brief. The research changed a number of assumptions (energy demand, staffing, the cyclone rule, the offshore archetypes, and calling it a "country"). The revised list is in the synthesis.

Every chapter of this study works from these assumptions. If a chapter finds that an assumption is wrong or infeasible, it says so explicitly and proposes a revision rather than silently using different numbers.

The brief

A group of libertarian-minded people want to found their own floating polity: a permanent, self-governing community at sea. Not a raft, not a cruise ship, but acres of floating town with houses, gardens and public space, powered entirely by solar.

Population

Item Launch (Phase 1) Design growth (Phase 2)
Families 25 (range 20 to 30) 75
Residents ~100 (avg 4 per family, includes ~35 children) ~300
Resident staff / crew (marine ops, engineering, medical) ~10 to 15 ~30
Visitors / short-stay at any time up to 20 up to 60

Utilities are sized for 150 people in Phase 1, with modular expansion to 400.

Platform size and land use (Phase 1)

Target usable deck area: ~20,000 m² (≈ 2 ha, ≈ 5 acres).

Use Area (m²) Notes
25 houses, footprint 3,750 150 m² footprint, 2 storeys, ~250 m² floor area each
Private gardens 2,500 ~100 m² per house
Communal buildings 1,500 school, clinic, town hall, café/store, workshop, guest rooms
Utilities and plant 800 power room, batteries, desalination, wastewater, stores
Food production 2,000 greenhouse, hydroponics, orchard beds
Public open space 5,000 park, plaza, playground, sports court, pool
Circulation 2,500 paths, service lanes, emergency access
Marina / perimeter edge 2,000 boat moorings, fuel-free charging, ferry landing
Total ~20,000

Height and density are deliberately low: this is a village, not a tower block.

Location archetype (to be tested, not assumed)

Three candidate legal/physical settings are evaluated across the study:

  1. Host-nation sheltered waters: inside a lagoon, bay or behind a reef, within a cooperating state's territorial sea, under a negotiated special zone agreement. Calm water, easy logistics, limited sovereignty.
  2. Host-nation EEZ, exposed: 12 to 200 nm offshore, within a cooperating state's EEZ. More autonomy, much harsher ocean.
  3. High seas: beyond any EEZ (>200 nm). Maximum legal autonomy, open-ocean engineering, extreme logistics.

Physical preference: tropical, outside tropical cyclone belts (roughly within ±5 to 8° of the equator, or other basins with negligible cyclone risk), modest wave climate, water depth suitable for mooring, within reach of a port and an airport.

Energy brief (to be validated in the systems chapter)

  • "Fully solar powered" is the aspiration. Indicative demand ~1 MWh/day for Phase 1 (efficient homes with air-conditioning, desalination, wastewater treatment, communal loads, electric boats).
  • The systems chapter must say honestly whether a backup source is needed for safety (e.g. emergency generation for life-safety loads) and how to keep that consistent with the solar brief.

Design life and standards

  • Design life: 50 years for the hull/platform, with maintenance plan.
  • Survivability: design for the 100-year return period storm at the chosen site; evacuation plan for anything beyond.
  • Reference standards: classification-society rules (DNV, ABS, Bureau Veritas) for floating structures; Eurocodes/ACI for concrete; national building codes for superstructure where a host state applies.

Money

  • All costs in 2026 US dollars, with the source year and any escalation stated.
  • Ranges (low / central / high) are preferred over point estimates.

Conventions for all chapters

  • British spelling.
  • Every non-obvious factual claim carries a footnote reference ([^n]) to a source with a working URL. No invented sources. If something is an estimate or judgement, say so.
  • Each chapter ends with a Verdict box: Green (feasible), Amber (feasible with significant caveats), Red (showstopper), with the top risks listed.